Rainwater Harvesting Projects & Case Studies

Rainwater Harvesting Projects & Case Studies

Real projects executed by NIPSTec for industrial, commercial and institutional clients across India — from site survey and design to construction, commissioning and maintenance.

Featured Case Study

Salient Features – Rainwater Harvesting Project

NIPSTec prepares site-specific case studies and executes the projects accordingly. This case study highlights a rainwater harvesting and groundwater recharge project designed and engineered by NIPSTec. The project incorporates a scientifically planned collection tank, multiple online filtration units and a deep recharge borewell to facilitate effective rainwater collection, filtration and groundwater replenishment. Based on the building’s catchment area and local annual rainfall, the system is designed to make approximately 286 cubic metres of rainwater available for recharge annually. The following salient features present the key project parameters and design specifications.

Salient FeaturesProject Details
Total Catchment Area of Building650 Sq. m
Average Annual Rainfall550 mm
Projected Water Available for Recharge Annually286 Cum
Projected Water Available for Recharge – Maximum per Hour13 Cum
Size of the Tank4 × 2.5 × 2.25 m
Depth of Recharge Borewell49 m bgl
No. of Filters and Filtration4 – Online

Engineering Drawings & Technical Designs

NIPSTec follows a systematic engineering approach to rainwater harvesting and groundwater recharge projects. The following drawings illustrate sample engineering sections, structural detailing and technical design arrangements developed for project planning and execution. These drawings demonstrate our technical expertise and engineering capabilities in designing effective rainwater harvesting and groundwater recharge systems.

Project Photographs – Before, During & After

Need a similar solution for your facility?

Contact NIPSTec for a technical assessment.