Rainwater Harvesting Projects & Case Studies
Real projects executed by NIPSTec for industrial, commercial and institutional clients across India — from site survey and design to construction, commissioning and maintenance.
Featured Case Study
Salient Features – Rainwater Harvesting Project
NIPSTec prepares site-specific case studies and executes the projects accordingly. This case study highlights a rainwater harvesting and groundwater recharge project designed and engineered by NIPSTec. The project incorporates a scientifically planned collection tank, multiple online filtration units and a deep recharge borewell to facilitate effective rainwater collection, filtration and groundwater replenishment. Based on the building’s catchment area and local annual rainfall, the system is designed to make approximately 286 cubic metres of rainwater available for recharge annually. The following salient features present the key project parameters and design specifications.
| Salient Features | Project Details |
|---|---|
| Total Catchment Area of Building | 650 Sq. m |
| Average Annual Rainfall | 550 mm |
| Projected Water Available for Recharge Annually | 286 Cum |
| Projected Water Available for Recharge – Maximum per Hour | 13 Cum |
| Size of the Tank | 4 × 2.5 × 2.25 m |
| Depth of Recharge Borewell | 49 m bgl |
| No. of Filters and Filtration | 4 – Online |
Engineering Drawings & Technical Designs
NIPSTec follows a systematic engineering approach to rainwater harvesting and groundwater recharge projects. The following drawings illustrate sample engineering sections, structural detailing and technical design arrangements developed for project planning and execution. These drawings demonstrate our technical expertise and engineering capabilities in designing effective rainwater harvesting and groundwater recharge systems.